TESTING & COMMISSIONING
We offers a broad range of factory and site acceptance tests, functional verification, and commissioning activities that are designed to meet the needs of modern power infrastructure.Our comprehensive testing and commissioning methodology ensures panorama coverage of failure modes while also ensuring that installations are commissioned and operations for purpose.Full and comprehensive commissioning ensures you experience the neglible amount of issues during the lifespan of your equipment.
Eternergy highly trained electrical engineers and technicians can undertake testing and commissioning services to ensure your equipment and systems are safe and meet critical standards and specifications through the lifecycle of your project.
Proper testing and commissioning of equipment and systems is critical to maintaining reliability for your customers.
TESTING SERVICES
All our commissioning activities are individually assessed and often the stringency of our testing meets the manufactures recommendations and International standards.Moreover, We developed innovative system operations, solutions to simplify the process to deliver the engineering activities, which can enhance the efficiency. It also enables future servicing and repairs to be made easier, with the use of up to date drawings and the backup of the previous commissioning activities.
High Voltage Switchboards
HV Switchyards & Transformer yards
Power generating station testing
Earthing Systems including NERs & NETs
HV Power Cable & Busbar systems
DC Battery Banks and UPS Systems
Pad-mount HV Installations
Primary injections, busbars, and transformer stability testing
Transmission and Distribution systems testing
HV & MV switchgears & LV switchboards testing
Measurement of overhead line parameters
Control and relay panels testing
Scheme and function testing protection & control panels
Performing on-load measurements ACDBS, DCBDS
RMU & Hybrid Switchgear testing
SPECIAL SERVICES
Eternegy uses state-of-the-art equipment to electrically test electrical power system assets. Our testing equipment utilizes unique test cards to perform special testing, which allows us to accurately store and transfer the data to our customers and generate detailed reports.
Central planning and management testing and maintenance
Testing of fault recorders and sequence of event recorders
Sweep frequency response testing (SFRA)
Dynamic contact resistance testing
Dissipation/power factor
Capacitance measurement
CT/ PT analyzer testing
Electrical diagnostics testing
Partial discharge testing and measurement analysis
Universal recloser control test
Circuit breaker tests
Transformer testing
PROTECTION & SCADA TESTING
Protection relay & SCADA technology has advanced dramatically over the years offering the end user a complex array of features. Often relays will however only require a fraction of those settings to be utilised. Protection relays whether they are of the electro-mechanical or microprocessor type, they are precise measuring devices and require periodic testing to prove correct functionality.
Eternegy engineering power system protection team are conversant in industry market relays and modern & comprehensive testing methods to ensure the protection system is safe and secure.
Protection relays configuration & testing of all relay make
Communication/protocol aspects tests
Goose functions testing of protective relays
Testing and calibration of energy meters
Installation, configuration of servers, networks, and equipment
TCP/IP, Ethernet network infrastructure
PLC, SCADA and HMI Testing/Commissioning
IEC61850, MMS, SV & IED scout GOOSE testing
End to End testing